Replace the roof first if it is anywhere near the end of its life. Panels last about as long as a roof, and taking them down later is a second trade’s job. If the panels are already up, a solar contractor removes them, a roofer reroofs and flashes new mounts, and the solar crew reinstalls and reconnects the array. Here is how that works around Portland and Vancouver.
Should you replace your roof before installing solar?
If the roof has less than about ten years left, yes. That is the line Energy Trust of Oregon draws: its FAQ says a roof must have at least ten years of remaining life for a solar project to qualify for its incentive, so the owner is not paying to remove the panels a few years later. Its consumer guide gives the same advice in plainer words: make sure the roof is in good condition and does not first need repair or replacement.
The Department of Energy makes the same point from the other direction. Its 2021 article on roofs and solar notes that panels last about 25 to 30 years, similar to a roof, so doing both at once avoids paying to have the panels re-installed. Its Homeowner’s Guide to Solar lists the age of the roof, and how long until it needs replacing, among the first things to weigh.
Ten years is not a rule about any one roof. A composition roof under Douglas firs in a wet Portland neighborhood ages differently from one in full sun, so the honest test is the condition of this roof. Our guide to how long a roof lasts in Portland covers what shortens a roof’s life here, and the repair-or-replace guide covers the signs that a roof is done.
If the roof will be replaced first, tell the roofer that solar is coming. Two choices are easier to make before the new roof goes on:
- Vents and other penetrations. Oregon’s code says panels must not be placed where they would block plumbing or mechanical vents, skylights or drains (R324.6.5 in the 2023 Oregon Residential Specialty Code). Moving a vent stack or a bath fan cap off the sunny plane is simplest with the roofing off.
- The roof covering. Oregon’s prescriptive path for adding panels to an existing house, the one that avoids an engineer, works only on metal roofing, a single layer of wood shingle or shake, or no more than two layers of composition shingle (the exception to R324.4.1, an Oregon amendment). It also allows clamps on standing seam metal panels instead of holes through the roof, within limits on clamp strength, spacing and panel gauge, which is one reason some owners choose metal roofing under a planned array.
What happens if you need a new roof but already have solar panels?
The Department of Energy puts it simply: during a roof replacement, the panels and the mounting system have to come off. The usual order of work is:
- Check the system first. The solar contractor confirms the array is working and notes what it produces, so any later fault can be traced to the right step.
- Shut down and take down. The solar crew shuts the system down, disconnects the modules, lifts them off the racking and stores them, then removes the racking and mounts.
- Reroof. The roofer tears off, repairs the deck, lays underlayment and new roofing, and installs new flashing at each mount location.
- Reinstall and reconnect. The solar crew sets the mounts and racking, puts the modules back and reconnects them.
- Inspect and restart. Where the work was permitted, an inspector checks it, and the solar contractor restarts the system and confirms it produces what it did before.
The gap between steps 2 and 4 is the part to plan. The panels produce nothing while they are off, and the roof is a construction site for that whole time.
Who is allowed to take the panels off and put them back?
This is where most of the confusion sits, and the two states answer it slightly differently.
Oregon. The Building Codes Division’s solar licensing rule, OAR 918-282-0400, splits the job in two. People placing structural elements, including roofs, racking and building-integrated modules, do not need an electrical license. But on a system of up to 50 kW AC, which covers ordinary houses, attaching modules to the racking and making the connections between modules, plug-type connectors included, must be done by a limited renewable energy technician, a general journeyman or supervising electrician, or a limited residential electrician. The technician license itself comes from ORS 479.630, which requires a two-year apprenticeship and an exam, and lets the technician work only for a licensed electrical contractor or a limited renewable energy contractor.
The rule does not mention taking modules down, but putting them back on the racking and reconnecting them is plainly licensed work, so treat the whole detach-and-reset as the solar contractor’s job. A roofer can still lift and reset racking under the rule, and some roofing firms employ licensed solar technicians; ask who on the crew holds which license. One narrow exception: Oregon law lets owners do electrical work on their own home, and Portland’s permit guidance says the owner must also live there and the house must not be headed for sale or rent.
Washington. Washington’s rule for solar, WAC 296-46B-690, lets the owner, a registered general contractor or a licensed electrical contractor build a purely mechanical support structure without an electrical permit, and says all electrical work must be done by the owner or the appropriate electrical contractor. L&I’s chief electrical inspector put it more bluntly in an August 2023 bulletin: PV parts and components are to be installed and maintained by licensed electrical contractors and certified electricians, and construction contractors who are not electrical contractors may not install PV equipment outside narrow building-integrated cases.
Either way, check both businesses before signing: the roofer and the solar contractor on the Construction Contractors Board’s license search in Oregon, or on L&I’s Verify a Contractor tool in Washington.
Permits for a reroof under solar panels
| Part of the job | Portland and Oregon | Vancouver and Clark County |
|---|---|---|
| The reroof | Exempt from a building permit statewide where the added dead load is 4 psf or less, except townhouses, building-integrated solar roofing and some wildfire-standard houses (2026 ORSC R105.2, item 15) | Vancouver exempts a straight reroof inside city limits; Clark County requires a re-roofing permit for every building |
| Rack-mounted panels | Portland lists installing solar panels as building permit work; its fee schedule prices renewable energy electrical permits for installation, alteration or relocation | Vancouver uses separate building and electrical checklists for residential solar; the County issues a solar panels permit |
| Solar shingles or tiles | A reroof permit is required statewide | No separate rule found; ask the City or County permit center |
Sources: the state’s 2026 Chapter 1, Portland’s solar permits page and electrical fee schedule, the City of Vancouver’s residential solar checklist and Clark County’s residential permits page, all read on October 10, 2026.
No city we checked publishes a rule written for a detach-and-reset, so the table is the honest summary: expect electrical permit work for the panels and check whether your city also wants a building permit for the reinstalled mounts. Portland says the solar contractor applies for permits and arranges inspections. Put “who pulls which permit” in writing before the panels come off. The roof permit guide has the city-by-city rules for the reroof itself, and the Vancouver page explains where city limits end and the County begins.
Solar shingles and solar roof tiles
Solar shingles and tiles are a different job, because the solar product is the roof covering rather than something bolted on top of it. That changes three things.
- It needs a permit. Oregon’s reroofing exemption does not cover “building-integrated photovoltaic roof panels and other photovoltaic roof coverings”, which are listed as exceptions in the 2026 Chapter 1. Portland’s solar page sends solar roof tile projects through its engineered systems process, and waives the engineer only where the installed system weighs 4 psf or less, the tiles go directly on the existing sheathing after all old roofing is removed, and every tile, active or not, is uniformly supported.
- It is held to roofing rules. Oregon’s code treats photovoltaic shingles as a roof covering: a solid or closely fitted deck, a slope of at least 2:12, underlayment as for other roofing, a UL 7103 listing (or UL 61730-1 and -2), and the maker’s attachment instructions (R905.16 in the 2023 code).
- Two trades still share it. In Oregon, placing building-integrated modules needs no electrical license, but the wiring does. In Washington, placing and securing them is exempt only once an authorized electrical contractor has already pulled the electrical permit.
The federal tax angle has also changed. The IRS says the Residential Clean Energy Credit is not available for property placed in service after December 31, 2025. Solar shingles qualified while it ran; ordinary roofing never did.
Mounts, flashing and the new roof
On a composition roof, a rack-mounted array is held on by fasteners through the new roofing, so the flashing at those points matters as much as the roofing between them. Oregon’s code requires rooftop solar to carry the same fire classification as the roof and requires roof penetrations to be flashed and sealed to the roofing chapter (R324.4.2 and R324.4.3). On Oregon’s prescriptive path, attachments go into the rafters, trusses or blocking, no more than 48 inches apart, and closer, at 24 inches, within 3 feet of an edge, hip, eave or ridge. No support may sit within 12 inches of the low point of a valley (R324.6.7), and the layout must leave the fire-access pathways the code describes (R324.6.8).
Energy Trust’s installation requirements for its solar trade allies (the version on its site is dated June 2017) describe what a good mount looks like on composition shingles: a flat metal flange that runs under the shingles on the uphill side and over them on the downhill side, with sealant never the only thing keeping water out. That is the detail to ask about.
Questions for the bid:
- Will every mount get a new flashing, rather than the old one reused?
- Who lays out the mount locations on the new roof, and will they land on framing?
- Who is responsible if a mount leaks, the roofer or the solar contractor?
- Are any vents, pipe boots or skylights near the array being moved or replaced while the roof is open?
What happens to your roof and solar warranties?
Two warranties meet on a solar roof, and the roofing one does not cover the solar work. Malarkey, the shingle maker headquartered in Portland, is a useful example because its documents are specific. Its technical bulletin on rooftop solar (March 2020) allows compatible solar equipment on its warrantied roofs, but says the solar equipment, its flashings and its installation are not covered, and neither is damage to the roof caused by installing it. A leak traced to a manufacturing defect is still covered. Its Limited Systems Warranty goes further: it excludes penetrations made for rooftop equipment such as solar panels after the roof is installed, and Malarkey will not pay to remove and replace solar panels in order to carry out a valid repair.
Other makers word it differently, so read the warranty for the shingles you are buying. Malarkey’s bulletin also recommends that the homeowner’s roofer review the solar mounting details before work starts, which is good practice with any brand.
On the solar side, ask two questions in writing. Does the original installer’s workmanship warranty survive if another company takes the array down and puts it back? And what does the company doing the detach-and-reset warrant: its reconnections, the mounts it reset, or both? The simplest arrangement is one company answerable for the array and one for the roof, each with the other’s work documented.
Scheduling and cost
Book both trades together. The solar contractor’s crew comes first and last, and the roofer works in the middle, so a gap in either schedule leaves the roof open or the panels idle. In Portland the wet season is long: NOAA’s 1991-2020 climate normals for Portland International Airport show measurable rain on roughly 16 to 19 days in each month from November through March, so a reroof under solar is easier to schedule in the drier months.
On cost, we publish no figure for a detach-and-reset, because no source we trust prices one for this market. What we can say:
- The reroof is priced the same way as any other; the roof replacement cost page shows sourced, dated figures.
- The detach-and-reset is extra and belongs on its own line, ideally from the company that will warrant the reinstalled array.
- The Department of Energy’s 2021 article cites researchers at the National Renewable Energy Laboratory who estimated that doing a reroof and a new solar installation together costs less, on average, than doing them separately.
Be wary of a “free roof with solar” pitch. Energy Trust’s consumer guide lists claims of “free” solar, tight deadlines and pressure to sign quickly as red flags.
The roof replacement page lists what a full replacement bid should spell out. To describe your roof and the panels on it, use the request form. Whoever you hire, check the roofer and the solar contractor first: an active license on the Construction Contractors Board’s search in Oregon, or an L&I registration in Washington.
This page is general information, not professional advice about your specific situation. Have it assessed by a qualified professional before making decisions. Last reviewed October 10, 2026.